Category: Residential
Location: Seattle, WA
Formula 7 Electric completed the full electrical construction for a new residential development consisting of two single-family residences (SFRs), two attached accessory dwelling units (AADUs), and two detached accessory dwelling units (DADUs) in Seattle, WA. Our team performed the complete electrical installation from underground rough-in through final trim, including electrical services, meter equipment, electrical panels, branch circuit wiring, lighting, receptacles, dedicated equipment circuits, and all final electrical connections for each residence.
The project also included complete structured data cabling, low-voltage wiring, underground electrical infrastructure, utility metering equipment, and the electrical systems serving the stormwater sump pump station, including sump pumps and control panel. Every electrical system was installed in accordance with current National Electrical Code (NEC), City of Seattle requirements, and utility standards, delivering safe, reliable, and professionally installed electrical systems built for long-term performance.








